Skip to content
  • ZipCode Api
  • Blog
  • About RedLine13
RedLine13
RedLine13
Primary Navigation Menu
Menu
  • Start Testing
  • Demo
  • Pricing
  • JMeter
  • Partners
  • Docs
    • Documentation Home
    • AWS Set Up for load testing
    • AWS Approval for Large Tests
    • PHP, NodeJS, Python Load Tests
    • Scalability
    • Jenkins Plugin Setup
    • Premium Features
    • Knowledge Base

duration assertion

How to for JMeter Duration Assertion

2016-02-29

How to use the Duration Assertion to fail a test? The Apache JMeter Duration Assertion documentation http://jmeter.apache.org/usermanual/component_reference.html#Duration_Assertion  Definition: The Duration Assertion validates that each response is received within a given amount of time. Any response that takes longer than the given number of milliseconds (specified by the user) is recorded as a failed response. Parameter Usage Duration in milliseconds If the requests take longer than ms supplied, Sampler is considered failed Apply to Main and Sub-Samples Main SamplesRead More →

Recent Posts

  • JMeter XML Format Post Processor
  • Order of Elements in JMeter
  • The JMeter Synthesis Report
  • Using the JMeter Plugins Manager
  • JMeter Rotating JTL Listener

Related

    © RedLine13, LLC | Privacy Policy | Contract
    Contact Us: info@redline13.com

    Designed using Responsive Brix. Powered by WordPress.